REFERENCES
|
SITES TECHNICAL SUPPORT |
DESIGN |
||
|
February 2006: |
Italy.
Installed electronical weight limiter on hydraulic crane with telescopic boom |
Mechanical |
Casting
tubes rack Mechanical
crane winch |
|
March¸September 2006: |
|
|
Hydraulic
grab support Doubble
rotory discharge detritals |
|
November 2006: |
|
|
Lifting
counterweight system for mechanical crane |
|
March 2007: |
|
|
Grab driving |
|
April 2007: |
Tuttle
Creek (Kansas). Arranged the equipments (mixing plant, electronical devices
for rigs, electrical distribution system) for the later test site |
|
Crane mechanical boom stops |
|
May 2007: |
Folsom
( |
|
|
|
October 2007: |
Seattle
(Washington). Technical support from |
Thermotechnical and electrical |
Heating
system for bifamily house in Montiano (FC) |
|
|
|
|
Heating
and electrical distribution system for house in Montiano (FC) historical
centre |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|